Generally
No permit required by the building code to begin work for new construction or any other building operation shall be issued until the fees prescribed by this section have been paid, nor shall an amendment, for any reason, to a permit be approved until the additional fee has been paid.
Administrative Services
The fees for administrative services shall be as follows:
Permit amendments, renewals, extensions, reinstatement and change of ownership/contract change, |
$40.00 |
If an application for a permit is cancelled by written request to the Building Official within six months of the application date or within twelve months of the issue date, |
30% |
Public service request/Staff research/FOIA Fee | Actual Admin Cost/ 1hr minimum |
Building Permits
Building Fees shall be as follows:
State Levy of all Applicable Permit Fees
|
2.00%
|
Re-inspection Fee | $100.00 |
Code Investigation Fee | $100.00 |
New Construction (Residential and Commercial)
|
$0.16 per sq.ft. on site 1.00% of Contract |
Swimming Pools | $70.00 |
Fences around swimming pools and residential fences over 6' in height | $40.00 |
Commercial Fence (regardless of height) | $40.00 |
Signs up to 10 sq ft in surface area, 20 sq ft for a double-sided sign, the top of the sign being 10' or less from the ground Signs more than 10 sq ft in surface area, 20 sq ft for a double-sided sign, the top of the sign being more than 10' from the ground |
$40.00 $60.00 |
Demolition or Moved Structure | $70.00 |
Chimney | $70.00 |
Commercial re-roofing | $50.00 |
Tents (over 900 square feet) | $80.00 |
Elevator (Initial and annual re-certification) | $50.00 |
Retaining Walls (as defined by Building Code), Towers, Piers, etc. | $50.00 |
Amusement Rides
|
|
Commercial Plan Review (New Construction) | $250.00 |
Residential Plan Review (New Construction) | $50.00 |
Commercial Change of Occupancy/Use | Building Permit needed |
Appeals | $0.00 |
Electrical Permits
Residential | Base fee plus $.06 per sq. ft. |
Electrical Upgrade or relocation of electrical services | $50.00 |
Temporary Electrical Pole (TEP) | $50.00 |
Early Meter Release (Not Part of any other Inspection) | $50.00 |
Connections and Outlets (lights etc. typically in additions or re-models) | $50.00 |
Commercial (New Construction) | 1% of Contract (unchanged) |
Generator | $75.00 + Gas |
Plumbing Permits
Residential | Base fee plus $.06 per sq. ft. |
Commercial | 1% of contract price |
Mechanical Permits
Residential | Base fee plus $.06 per sq. ft. |
Fuel Storage Tanks, removal or installation (underground or above ground) | $100.00 per tank |
Gas Piping | $40.00 |
Generators | $75.00 + Elec. |
Commercial | 1% of contract price |
Fire Suppression
Fire Suppression | 1% of contract price |
SUSSEX COUNTY SOLAR PV PERMIT SCHEDULE
SOLAR PV PANEL SYSTEM RATINGS | ELECTRICAL PERMIT FEE |
0-5,000 (WATTS) | $50.00 |
5,001-10,000 (WATTS) | $100.00 |
10,001-20,000 (WATTS) | $200.00 |
20,001-30,000 (WATTS) | $300.00 |
30,001-40,000 (WATTS) | $400.00 |
40,001-1,000,000 (WATTS) | $400.00 plus $25.00 for each additional 10,000 (WATTS) over 40,000 (WATTS) |
1,000,000-5,000,000 (WATTS) | $2800.00 plus $20.00 for each additional 10,000 (WATTS) over 1,000,000 (WATTS) |
5,000,000---LARGER (WATTS) | $10,800.00 plus $15.00 for each additional 10,000 (WATTS) over 5,000,000 (WATTS) |
REFERENCES: *ONE(1) KILOWATT(KW)= 1,000 WATTS(W) *ONE(1) MEGAWATT(MW)= 1,000,000 WATTS(W) |
|
NOTE: *IN ADDITION TO THE SOLAR PV PANEL SYSTEM ELECTRICAL PERMIT FEES, ANY BUILDING STRUCTURES ON THE SITE SHALL REQUIRE A BUILDING PERMIT BASED ON THE CURRENT SURRY COUNTY BUILDING FEE SCHEDULE | |
REQUIRED: *TWO(2) SETS OF PLANS-APPROVED *ZONING APPROVAL *BASED ON LAND DISTURBANCE---AN APPROVED EROSION & SEDIMENT |
|
CONTROL PLAN AND AN APPROVED STORMWATER MANAGEMENT PLAN MAY BE NECESSARY *PERMIT FEES REQUIRE THE ADDITION OF A 2% STATE LEVY FEE |
Physical Address:
20135 Princeton Road
Sussex, Virginia 23884
Mailing Address:
Post Office Box 1397
Sussex, Virginia 23884
Office Hours:
8:00 a.m. to 4:30 p.m. M-F
Phone:
(434) 246-4390
Fax:
(434) 246-8259